Tub-to-shower conversion in Sacramento.
The old tub comes out, a tiled walk-in shower goes in. New valve, drain, shower pan, waterproofing, tile and glass, built by a licensed general contractor, not a liner set over the old tub.
In a lot of homes the tub gets used a few times a year. The shower over it gets used every day.
Choose the shower that fits the room.
We look at the floor, the plumbing and how you'll use the room, then recommend the one that fits.
From tub to shower, in this order.
You know what happens next before it happens, and what it costs before we start.
Walkthrough
We measure the alcove, check the floor and the plumbing wall, and talk through tile, glass and fixtures.
Written estimate
Line-item price, allowances for tile and glass, a schedule and a start date. Permit included when the job needs one.
Demolition and rough-in
Tub and surround out, valve and drain moved or replaced, framing fixed, pan built and waterproofed and tested.
Tile, glass and hand-over
Tile set, fixtures installed, glass measured and installed, final inspection and a walkthrough with you.
Walk-in showers we've built.
Real projects, photographed on site by our team. Tap any photo to see it full screen.



Everything between the old tub and the new shower.
One contractor, one contract. We bring in licensed specialty trades where the job calls for it and manage the schedule.
Your price comes after we see the bathroom.
A conversion in the same alcove costs very differently from one that moves the drain or goes curbless. The first visit is free: we look at the room with you, listen to what you want and the budget you have in mind, and take measurements.
Every conversion comes with a written 1-year workmanship warranty.
“Excellent experience from start to finish. The team was professional, friendly, and paid great attention to detail. Really happy with the overall quality of work.”
Henry · Google review · ★★★★★
Tub-to-shower conversion FAQ.
How long does a tub-to-shower conversion take?
Usually 2 to 3 weeks of work, from demolition to the final walkthrough, when nothing holds it up. The whole project can take up to two months: permit review times differ from city to city, special-order tile, fixtures and glass take time to arrive, and some decisions take a while to make. Custom glass is measured after the tile is set, so part of the time is waiting for it. You get a written schedule with your estimate, and we tell you right away if anything moves it.
Will removing the tub hurt my resale value?
If another bathroom in the house still has a tub, buyers rarely mind, and a well-built walk-in shower is a selling point. If it is the only tub in the house and families with small children are likely buyers, we'll say so during the walkthrough so you can decide.
Do I need a permit?
In most cities in our area, yes, when the valve or drain is changed. We tell you during the walkthrough, pull the permit and meet the inspector.
Can the new shower have no curb?
Often, yes. It depends on the floor: a raised wood floor can usually be recessed, a slab needs to be cut for the drain. We check during the walkthrough and price both options if you want to compare.
Why not a one-day acrylic insert?
An insert covers the old tub area without showing what's behind it. Many tubs we remove have old leaks, soft subfloor or failed waterproofing. We take everything out, fix it and build a tiled shower with new waterproofing, so the problem doesn't come back.
Can you add a bench, a niche and grab bars?
Yes. A niche and a bench are planned before framing, and we add solid blocking in the walls so grab bars can go in now or later.
Can we use the bathroom during the work?
Not the shower. If it is your only bathroom, we plan the order of work with you before demolition to keep that time as short as possible.
Do you speak Russian? / Вы говорите по-русски?
Yes. You can go through the whole project in Russian: the estimate, the questions and the day-to-day on site. Да, ведём проект на русском от сметы до сдачи.
Tell us about your project.
Send the basics. We reply within one business day to set up a walkthrough, then put real numbers on paper.
Request received.
We'll look it over and reply within one business day.
Talk it through with Daniel, any time.
Daniel is our AI assistant. He talks through your project with you by voice, day or night, in English or Russian. He asks the right questions and writes it all down: the rooms, rough sizes, what you want changed, your timeline and budget. Val reviews everything and follows up with you.
- Available 24/7, evenings and weekends
- English and Russian
- Takes 2–3 minutes, right in your browser
