CSLB #1155926 · Licensed, Insured & Bonded Говорим по-русски · We speak Russian
Call or text(916) 306-8833 Free consultation
★★★★★5.0on Google · 15 reviews

Tub-to-shower conversion in Sacramento.

The old tub comes out, a tiled walk-in shower goes in. New valve, drain, shower pan, waterproofing, tile and glass, built by a licensed general contractor, not a liner set over the old tub.

★★★★★ 5.0 · 15 Google reviews CSLB #1155926 Licensed, Insured & Bonded

In a lot of homes the tub gets used a few times a year. The shower over it gets used every day.

Easier to step ina low curb or no curb at all, instead of climbing over a tub wall
More rooma 60-inch alcove becomes a full-size shower with a niche and a bench
Built to lastnew waterproofing behind the tile, where most old leaks start
Your options

Choose the shower that fits the room.

We look at the floor, the plumbing and how you'll use the room, then recommend the one that fits.

Walk-in shower with a low curbThe most common conversion. A short curb holds the water, glass door or fixed panel, tile from floor to ceiling.
Curbless showerFloor and shower at one level, with a linear drain. On a raised wood floor we recess the subfloor; on a slab the concrete is cut for the drain. We tell you which you have during the walkthrough.
Safety-first showerLow threshold, built-in bench, handheld shower on a slide bar and blocking in the walls for grab bars, for aging in place or a parent moving in.
Not a liner over the old tubOne-day acrylic inserts cover the problem. We take the tub out, check what's behind it and build the shower from the studs.
How it works

From tub to shower, in this order.

You know what happens next before it happens, and what it costs before we start.

1

Walkthrough

We measure the alcove, check the floor and the plumbing wall, and talk through tile, glass and fixtures.

2

Written estimate

Line-item price, allowances for tile and glass, a schedule and a start date. Permit included when the job needs one.

3

Demolition and rough-in

Tub and surround out, valve and drain moved or replaced, framing fixed, pan built and waterproofed and tested.

4

Tile, glass and hand-over

Tile set, fixtures installed, glass measured and installed, final inspection and a walkthrough with you.

What's included

Everything between the old tub and the new shower.

One contractor, one contract. We bring in licensed specialty trades where the job calls for it and manage the schedule.

Demolition and haul-offTub, surround and old tile removed, the rest of the house protected.
PlumbingNew shower valve, drain moved to the right spot, supply lines replaced where needed.
Framing and repairsRot or old water damage fixed before anything gets covered.
Shower pan and waterproofingSloped to the drain, waterproofed and flood-tested before tile.
TileWalls, floor, niche and bench, set flat and straight.
Glass and fixturesGlass door or panel, shower head, handheld and trim installed.
Ventilation and lightingExhaust fan and shower light when the room needs them.
Permits and inspectionsWe pull the permit and meet the inspector when the work requires one.
Pricing

Your price comes after we see the bathroom.

A conversion in the same alcove costs very differently from one that moves the drain or goes curbless. The first visit is free: we look at the room with you, listen to what you want and the budget you have in mind, and take measurements.

Free walkthroughWe see the bathroom, talk through options and answer questions on the spot.
Written, itemized estimateLine by line, with allowances for tile, glass and fixtures, so you see where every dollar goes.
Options that save moneyKeeping the drain where it is, or a fixed glass panel instead of a door, when it makes sense.
Typical timeline: 2–3 weeks of workWhen nothing holds it up. Permit review times differ by city, special-order materials and custom glass take time, and some choices take a while to make, so a project can run up to two months. Your schedule is set in the estimate.

Every conversion comes with a written 1-year workmanship warranty.

In writingwarranty terms are part of your contract
Manufacturerwarranties on valves, fixtures and glass pass to you
CSLB #1155926licensed, insured and bonded
From a client

“Excellent experience from start to finish. The team was professional, friendly, and paid great attention to detail. Really happy with the overall quality of work.”

Henry · Google review · ★★★★★

Questions

Tub-to-shower conversion FAQ.

How long does a tub-to-shower conversion take?

Usually 2 to 3 weeks of work, from demolition to the final walkthrough, when nothing holds it up. The whole project can take up to two months: permit review times differ from city to city, special-order tile, fixtures and glass take time to arrive, and some decisions take a while to make. Custom glass is measured after the tile is set, so part of the time is waiting for it. You get a written schedule with your estimate, and we tell you right away if anything moves it.

Will removing the tub hurt my resale value?

If another bathroom in the house still has a tub, buyers rarely mind, and a well-built walk-in shower is a selling point. If it is the only tub in the house and families with small children are likely buyers, we'll say so during the walkthrough so you can decide.

Do I need a permit?

In most cities in our area, yes, when the valve or drain is changed. We tell you during the walkthrough, pull the permit and meet the inspector.

Can the new shower have no curb?

Often, yes. It depends on the floor: a raised wood floor can usually be recessed, a slab needs to be cut for the drain. We check during the walkthrough and price both options if you want to compare.

Why not a one-day acrylic insert?

An insert covers the old tub area without showing what's behind it. Many tubs we remove have old leaks, soft subfloor or failed waterproofing. We take everything out, fix it and build a tiled shower with new waterproofing, so the problem doesn't come back.

Can you add a bench, a niche and grab bars?

Yes. A niche and a bench are planned before framing, and we add solid blocking in the walls so grab bars can go in now or later.

Can we use the bathroom during the work?

Not the shower. If it is your only bathroom, we plan the order of work with you before demolition to keep that time as short as possible.

Do you speak Russian? / Вы говорите по-русски?

Yes. You can go through the whole project in Russian: the estimate, the questions and the day-to-day on site. Да, ведём проект на русском от сметы до сдачи.

Planning a full bathroom remodel? See bathroom remodeling →

Free consultation

Tell us about your project.

Send the basics. We reply within one business day to set up a walkthrough, then put real numbers on paper.

We reply within one business day to set up a walkthrough. Your written estimate follows the visit.

Add project details optional

✓

Request received.

We'll look it over and reply within one business day.

Call or text(916) 306-8833
WhatsApp · Telegram · ViberWhatsAppTelegramViber
HoursMonday–Friday, 9 am – 6 pm
LanguagesEnglish · Русский
AI assistant · 24/7

Talk it through with Daniel, any time.

Daniel is our AI assistant. He talks through your project with you by voice, day or night, in English or Russian. He asks the right questions and writes it all down: the rooms, rough sizes, what you want changed, your timeline and budget. Val reviews everything and follows up with you.

  • Available 24/7, evenings and weekends
  • English and Russian
  • Takes 2–3 minutes, right in your browser
Call Text Free consultation