CSLB #1155926 · Licensed, Insured & Bonded Говорим по-русски · We speak Russian
Call or text(916) 306-8833 Free consultation
★★★★★5.0on Google · 15 reviews

Bathroom remodeling in Sacramento.

Primary baths, guest baths and tub-to-shower conversions, built by a licensed general contractor. Plumbing, waterproofing, tile and permits under one contract, with one person to call.

★★★★★ 5.0 · 15 Google reviews CSLB #1155926 Licensed, Insured & Bonded
What we remodel

From a guest bath refresh to a full primary suite.

Primary bathroomsLarger showers, double vanities, freestanding tubs, better light and storage. Often a layout change.
Guest and hall bathroomsNew tile, vanity, fixtures and lighting in the same footprint, built to take daily use.
Tub-to-shower conversions →The tub comes out, a walk-in shower goes in: new valve, pan, waterproofing, tile and glass.
Walk-in and curbless showersLow or no threshold, linear drains, niches and benches planned before the tile goes up.
Before & after

Same bathroom. Drag to see the difference.

Two recent bathrooms in Sacramento, photographed on site by our team.

The finished bathroom: new tub, tile to the ceiling, fluted black vanity and arched mirror The same bathroom before: dated vanity, sliding tub doors and textured walls ◀ ▶ BeforeAfter
Sacramento

A complete bathroom remodel, down to the tub.

Everything in the room is new: the tub, tile to the ceiling with a recessed niche, a matte black rain shower, a floating fluted vanity, an arched mirror, lighting and the floor.

The finished bathroom: a tiled shower with a black-framed sliding glass door The same bathroom before: a worn fiberglass shower stall ◀ ▶ BeforeAfter
Sacramento

From a fiberglass stall to a tiled shower.

The old one-piece stall came out. In its place: a tiled shower with a niche and rain head behind black-framed sliding glass, plus a floating wood vanity, glass pendant lights and new flooring.

What's included

Everything between the old room and the new one.

You deal with one contractor. We plan the work, bring in licensed specialty trades where the job calls for it, and manage the schedule.

Design and layoutMeasured plan, tile and fixture selections, rendering on request.
Demolition and haul-offWork area protected, debris removed, not left in your driveway.
PlumbingNew valves, drains and supply lines, relocated when the layout changes.
Waterproofing and shower pansThe part you never see and the reason a shower lasts.
TileFloors, walls, niches and benches, set flat and straight.
Vanities, fixtures and glassInstalled, leveled and sealed.
Electrical, lighting and ventilationNew circuits, fixtures and an exhaust fan sized for the room.
Permits and inspectionsWe pull the permit and meet the inspector when the work requires one.
Pricing

Your price comes after we see the bathroom.

Every bathroom is different, so we don't publish price lists. The first visit is free: we look at the room with you, listen to what you want and the budget you have in mind, and take measurements.

Free walkthroughWe see the bathroom, talk through options and answer questions on the spot.
Written, itemized estimateLine by line, with allowances for tile and fixtures, so you see where every dollar goes.
Options that save moneyWhere it makes sense, we suggest materials and layouts that cost less without looking cheaper.
Typical timeline: 3–5 weeks of workWhen nothing holds it up. Permit review times differ by city, and special-order materials take time to arrive. Your schedule is set in the estimate.

Every bathroom comes with a written 1-year workmanship warranty.

In writingwarranty terms are part of your contract
Manufacturerwarranties on fixtures and materials pass to you
CSLB #1155926licensed, insured and bonded
From a client

“Very pleased with the bathroom remodeling. Everything looks clean, modern, and professionally finished. Great attention to detail.”

Blake N. · Google review · ★★★★★

Questions

Bathroom remodeling FAQ.

How long does a bathroom remodel take?

Most of our bathroom remodels take 3 to 5 weeks of work once tile and fixtures are on site. A tub-to-shower conversion is usually shorter; a primary bath with layout changes takes longer. The whole project can take more time than the work itself: permit review times differ from city to city, special-order materials take time to arrive, and some choices take a while to make. You get a written schedule with your estimate.

Why don't you list prices on the website?

Two bathrooms of the same size can need very different work. We'd rather see the room, understand what you want, and give you an accurate written estimate than a number that changes later.

Can we keep living in the house during the work?

Yes. We close off the work area, protect the floors on the way in and clean up at the end of each working day. If it is your only bathroom, we plan the schedule with you before demolition.

Do I need a permit?

Work that changes plumbing, electrical or the layout usually needs one. We tell you during the walkthrough, prepare the submittal, pull the permit and meet the inspector.

Can you turn my tub into a walk-in shower?

Yes, it is one of our most common projects. We remove the tub, move or replace the valve, build and waterproof the shower pan, tile the walls and install the glass. More about tub-to-shower conversions.

Do you help choose tile and fixtures?

Yes. We walk through options with you and can prepare a rendering, so you see the room before demolition. Allowances for tile and fixtures are listed in the estimate.

What happens if you find damage behind the walls?

We stop, show you what we found, and price the repair as a written change order. Nothing is added to your bill without your approval.

Do you speak Russian? / Вы говорите по-русски?

Yes. You can go through the whole project in Russian: the estimate, the questions and the day-to-day on site. Да, ведём проект на русском от сметы до сдачи.

Free consultation

Tell us about your project.

Send the basics. We reply within one business day to set up a walkthrough, then put real numbers on paper.

We reply within one business day to set up a walkthrough. Your written estimate follows the visit.

Add project details optional

✓

Request received.

We'll look it over and reply within one business day.

Call or text(916) 306-8833
WhatsApp · Telegram · ViberWhatsAppTelegramViber
HoursMonday–Friday, 9 am – 6 pm
LanguagesEnglish · Русский
AI assistant · 24/7

Talk it through with Daniel, any time.

Daniel is our AI assistant. He talks through your project with you by voice, day or night, in English or Russian. He asks the right questions and writes it all down: the rooms, rough sizes, what you want changed, your timeline and budget. Val reviews everything and follows up with you.

  • Available 24/7, evenings and weekends
  • English and Russian
  • Takes 2–3 minutes, right in your browser
Call Text Free consultation